23. Re-insert the controllers and reconnect the fibre channel cables.
24. Re-insert the power supply and fan units and reconnect the power supply
cords.
25. (For DS4700 Express Storage Subsystems with dc power supply and fan units
only) Turn on all attached disconnect devices before proceeding to step 26.
26. Power on the attached storage expansion enclosures.
27. Wait at least 3 minutes and then power on the DS4700 Express Storage
Subsystem. Verify the status of the configuration using LEDs and the DS4000
Storage Manager client program.
28. After removing the faulty cage frame with midplane assembly, transpose the
DS4700 Express serial number, machine type, and model tag from the faulty
cage frame assembly to the Repair Identification (RID) tag on the new cage
frame assembly. The RID tag is important in transferring the serial number,
machine type, and model from the faulty cage frame assembly to the new
cage frame assembly. Ensure that the new RID tag is affixed to the new cage
frame assembly before you dispose of the faulty cage frame with midplane
assembly. This will ensure that the warranty coverage is not interrupted.
182 IBM System Storage DS4700 Express Storage Subsystem: Installation, User’s and Maintenance Guide